DESIGN-BUILD-OPERATE SHOWCASE- New Lothrop, MI
Like many towns throughout the midwest, New Lothrop, MI was forced to abide by the new arsenic standards set forth by the EPA in 2001. The small town west of Flint, MI turned to Artesian for help.
Artesian responded with a plan to design, build, and operate the town's new required water treatment facility and in turn provide the town with great tasting water at a low cost to its people. Artesian's professionals took control and led the project from concept to completion.
| Included in this 1,632 square foot treatment facility are: | ![]() |
|





